Supply planning models for a remanufacturer under just-in-time manufacturing environment with reverse logistics
From MaRDI portal
Publication:512915
DOI10.1007/S10479-014-1569-7zbMATH Open1357.90096OpenAlexW2008828838MaRDI QIDQ512915FDOQ512915
Authors: Kyung Sung Jung, H. Neil Geismar, V. Daniel R. jun. Guide, Milind Dawande, Chelliah Sriskandarajah
Publication date: 3 March 2017
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-014-1569-7
Recommendations
Cites Work
- Title not available (Why is that?)
- Closed-loop supply chain models with product remanufacturing
- The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles
- OR FORUM—The Evolution of Closed-Loop Supply Chain Research
- Incentive and production decisions for remanufacturing operations
- Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution
- Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing
- One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties
- A concave-cost production planning problem with remanufacturing options
- Quantitative models for reverse logistics
- Supply chain scheduling: Just-in-time environment
Cited In (6)
- A closed-loop logistics model for remanufacturing
- Location-inventory decisions for closed-loop supply chain management in the presence of the secondary market
- An Outer Approximation Algorithm for Capacitated Disassembly Scheduling Problem with Parts Commonality and Random Demand
- Production planning with common parts in closed-loop supply chains
- A system dynamics model for dynamic capacity planning of remanufacturing in closed-loop supply chains
- Random misplacement and production process reliability: a sustainable industrial approach to deal with the discrepancy and deficiency
This page was built for publication: Supply planning models for a remanufacturer under just-in-time manufacturing environment with reverse logistics
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q512915)