Production scheduling for strategic open pit mine planning: a mixed-integer programming approach
From MaRDI portal
(Redirected from Publication:5144773)
Recommendations
- A new algorithm for the open-pit mine production scheduling problem
- An application of branch and cut to open pit mine scheduling
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
- Linear models for stockpiling in open-pit mine production scheduling problems
Cites work
- A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
- A new algorithm for the open-pit mine production scheduling problem
- A sliding time window heuristic for open pit mine block sequencing
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling
- Aggregation heuristic for the open-pit block scheduling problem
- An application of branch and cut to open pit mine scheduling
- Decomposition Principle for Linear Programs
- Hierarchical benders decomposition for open-pit mine block sequencing
- scientific article; zbMATH DE number 193993 (Why is no real title available?)
- scientific article; zbMATH DE number 1102774 (Why is no real title available?)
- Linear models for stockpiling in open-pit mine production scheduling problems
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
- Optimizing long-term production plans in underground and open-pit copper mines
- Optimizing the open pit-to-underground mining transition
- Polyhedral results for the precedence-constrained knapsack problem
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- Solving LP relaxations of large-scale precedence constrained problems
- Tailored Lagrangian relaxation for the open pit block sequencing problem
- The precedence constrained knapsack problem: separating maximally violated inequalities
- The Pseudoflow Algorithm: A New Algorithm for the Maximum-Flow Problem
Cited in
(47)- An application of branch and cut to open pit mine scheduling
- Modelling and optimizing an open-pit truck scheduling problem
- Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions
- A local branching heuristic for the open pit mine production scheduling problem
- Linear models for stockpiling in open-pit mine production scheduling problems
- A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers
- Optimization-based dispatching policies for open-pit mining
- A framework for adaptive open-pit mining planning under geological uncertainty
- A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: an application to the open-pit mine block sequencing problem
- Strategic planning of an underground mine with variable cut-off grades
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- A solution approach for optimizing long- and short-term production scheduling at LKAB's kiruna mine
- Practical performance of an open pit mine scheduling model considering blending and stockpiling
- Production planning and scheduling in mining scenarios under IPCC mining systems
- Evolutionary approach for large-scale mine scheduling
- Constructing branching trees of geostatistical simulations
- Hierarchical benders decomposition for open-pit mine block sequencing
- Optimizing long-term production plans in underground and open-pit copper mines
- A decomposition-based heuristic for collaborative scheduling in a network of open-pit mines
- Optimization-based heuristics for underground mine scheduling
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty
- Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty
- A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS
- MineLib: a library of open pit mining problems
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- The Problem Of Production Planning In Open Pit Mines
- scientific article; zbMATH DE number 1264440 (Why is no real title available?)
- A new algorithm for the open-pit mine production scheduling problem
- scientific article; zbMATH DE number 913714 (Why is no real title available?)
- Tailored Lagrangian relaxation for the open pit block sequencing problem
- Multi-objective short-term production scheduling for open-pit mines: a hierarchical decomposition-based algorithm
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining
- Integrated optimization model of multi-period open-pit mine production scheduling
- Scheduling with fixed maintenance, shared resources and nonlinear feedrate constraints: a mine planning case study
- Editorial
- A real-world mine excavators timetabling methodology in open-pit mining
- Application of an improved Lagrangian relaxation approach in the constrained long-term production scheduling problem under grade uncertainty
- Effective solution of the long-term open pit production planning problem using block clustering
- Optimization of open-pit mine design and production planning with an improved floating cone algorithm
- Solving LTPSOP in open-pit mines using Gaussian process and human mental search
- Multi-stage mine production timetabling with optimising the sizes of mining operations: an application of parallel-machine flow shop scheduling with lot streaming
- A direct block scheduling model considering operational space requirement for strategic open-pit mine production planning
- New cutting planes for open-pit mine scheduling with multi-period block extraction
- The new Fundamental Tree Algorithm for production scheduling of open pit mines
- A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity
This page was built for publication: Production scheduling for strategic open pit mine planning: a mixed-integer programming approach
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5144773)