The integrated cutting and packing heterogeneous precast beams multiperiod production planning problem
DOI10.1051/RO/2021107zbMATH Open1479.90172arXiv2008.11303OpenAlexW3195984212MaRDI QIDQ5158322FDOQ5158322
Authors: Kennedy Anderson Gumarães de Araújo, Tibérius de Oliveira e Bonates, Bruno de Athayde Prata
Publication date: 21 October 2021
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://arxiv.org/abs/2008.11303
Recommendations
- Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods
- The application of preprocessing and cutting plane techniques for a class of production planning problems
- A hierarchical approach for solving an integrated packing and sequence-optimization problem in production of glued laminated timber
- A Hybrid Optimization Framework for Cutting and Packing Problems
- Production scheduling across multi-machine packaging lines for the pre-scheduling level
- A hybrid method for large-scale short-term scheduling of make-and-pack production processes
- Packing by scheduling: using constraint programming to solve a complex 2D cutting stock problem
- Integrated production and material handling scheduling using mathematical programming and constraint programming
- Cutting and packing optimization. Problems modeling and solution methods.
Applications of statistics in engineering and industry; control charts (62P30) Approximation methods and heuristics in mathematical programming (90C59) Combinatorial optimization (90C27) Production models (90B30)
Cited In (4)
- Just‐in‐time scheduling problem with due windows and release dates for precast bridge girders
- Optimization of the cutting process integrated to the lot sizing in multi-plant paper production industries
- An optimization model for precast project planning using group concepts
- Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods
This page was built for publication: The integrated cutting and packing heterogeneous precast beams multiperiod production planning problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5158322)