Dynamic scheduling method for aircraft moving assembly line under uncertain supply of material
DOI10.11908/J.ISSN.0253-374X.2019.05.019zbMATH Open1438.90134MaRDI QIDQ5196341FDOQ5196341
Authors: Xinming Hu, Hongwei Zhu, Zhiqiang Lu
Publication date: 2 October 2019
Recommendations
- Dynamic scheduling problem of aircraft assembly based on quality prediction
- Integrated modeling of material delivery and container pickup problem for aircraft moving assembly line
- Dynamic scheduling of material delivery based on neural network and knowledge base
- Dynamic scheduling of manufacturing systems with machine learning
- Scheduling a Dynamic Aircraft Repair Shop with Limited Repair Resources
dynamic schedulingmachine learningsupport vector data descriptionaircraft moving assembly linelocal look-ahead searching
Learning and adaptive systems in artificial intelligence (68T05) Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36)
Cited In (5)
- Integrated modeling of material delivery and container pickup problem for aircraft moving assembly line
- Scheduling a Dynamic Aircraft Repair Shop with Limited Repair Resources
- Study of the method of material delivery in assembly process with uncertain processing time
- Dynamic scheduling problem of aircraft assembly based on quality prediction
- Dynamic scheduling of material delivery based on neural network and knowledge base
Uses Software
This page was built for publication: Dynamic scheduling method for aircraft moving assembly line under uncertain supply of material
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5196341)