scientific article; zbMATH DE number 7109369
From MaRDI portal
Publication:5197262
Recommendations
- Two-agent bounded parallel-batching scheduling for minimizing maximum cost and makespan
- A note on two-agent scheduling on an unbounded parallel-batching machine with makespan and maximum lateness objectives
- Two-agent scheduling on a bounded parallel-batching machine with makespan and maximum lateness objectives
- Two-agent scheduling on a bounded series-batch machine to minimize makespan and maximum cost
- Two-agent scheduling on an unbounded serial batching machine
- Scheduling two agents on uniform parallel machines with~makespan and cost functions
- Two-agent scheduling on uniform parallel machines with min-max criteria
- Serial-batching scheduling with two agents to minimize makespan and maximum cost
- Simultaneous optimization scheduling with two agents on an unbounded serial-batching machine
- Improved algorithms for two-agent scheduling on an unbounded serial-batching machine
Cited in
(20)- Two-agent scheduling to minimize the maximum cost with position-dependent jobs
- Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes
- A note on two-agent scheduling on an unbounded parallel-batching machine with makespan and maximum lateness objectives
- A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan
- Single machine batch scheduling with two non-disjoint agents and splitable jobs
- Two-agent scheduling on a bounded series-batch machine to minimize makespan and maximum cost
- Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost
- Two-agent bounded parallel-batching scheduling for minimizing maximum cost and makespan
- Two-agent scheduling on a bounded parallel-batching machine with makespan and maximum lateness objectives
- Serial-batching scheduling with two agents to minimize makespan and maximum cost
- Improved algorithms for two-agent scheduling on an unbounded serial-batching machine
- Scheduling two agents on uniform parallel machines with~makespan and cost functions
- Unbounded parallel-batching scheduling with two competitive agents
- Bounded parallel-batching scheduling with two competing agents
- Simultaneous optimization scheduling with two agents on an unbounded serial-batching machine
- Scheduling two interfering job sets on identical parallel machines with makespan and total completion time minimization
- Pareto optimization scheduling with two competing agents to minimize the number of tardy jobs and the maximum cost
- Two-agent scheduling on uniform parallel machines with min-max criteria
- Two-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependent
- Two-agent scheduling with agent specific batches on an unbounded serial batching machine
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5197262)