Rationalizing Tool Selection in a Flexible Manufacturing System for Sheet-Metal Products
DOI10.1287/OPRE.38.6.1104zbMATH Open0723.90034OpenAlexW2143816583MaRDI QIDQ5202018FDOQ5202018
Timothy J. Lowe, Mark S. Daskin, Philip C. Jones
Publication date: 1990
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://semanticscholar.org/paper/491345d3bce7336ef8d05e92a65dfd3c2d54a6a6
Recommendations
- An optimal tool selection procedure for the initial design phase of a flexible manufacturing system
- A model of machine-tool selection and operation allocation in FMS
- Modelling and solving an FMS part selection problem
- Tool planning models for flexible manufacturing systems
- Heuristics for determining economic processing rates in a flexible manufacturing system
Applications of mathematical programming (90C90) Computational methods for problems pertaining to operations research and mathematical programming (90-08) Production models (90B30)
Cited In (13)
- A comparison of Lagrangean and surrogate relaxations for the maximal covering location problem
- Bayesian coverage optimization models
- Times and costs analysis for sheet-metal cutting processes in an integrated CAD/CAM system
- Emergency service systems: The use of the hypercube queueing model in the solution of probabilistic location problems
- A hierarchical approach for metal parts fabrication
- Maximal covering code multiplexing access telecommunication networks
- AMST'02. Advanced manufacturing systems and technology. Proceedings of the sixth international conference, Udine, Italy, June 20, 2002
- An optimal tool selection procedure for the initial design phase of a flexible manufacturing system
- Application of facility location modeling constructs to vendor selection problems
- On the considerations for the design of an automated aircraft sheet metal component production loft generation system
- The multimode covering location problem
- Exact Solution of Two Location Problems via Branch-and-Bound
- Improved complexity bounds for location problems on the real line
This page was built for publication: Rationalizing Tool Selection in a Flexible Manufacturing System for Sheet-Metal Products
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5202018)