New heuristics for modeling temporal constraints and generating PERT network with minimum number of dummy-arcs
zbMATH Open1438.90114MaRDI QIDQ5223871FDOQ5223871
Nasser Eddine Mouhoub, Abdelhamid Benhocine, Abdelkader Gasmi
Publication date: 18 July 2019
Full work available at URL: http://aos.ro/wp-content/anale/MVol10Nr2Art.9.pdf
Recommendations
- A new method for constructing a minimal PERT network
- A heuristic for constructing activity-on-arrow pert networks with minimal dummy activities
- scientific article; zbMATH DE number 1234734
- The minimum dummy task problem
- On the computational complexity of the minimum-dummy-activities problem in a pert network
Approximation methods and heuristics in mathematical programming (90C59) Graph theory (including graph drawing) in computer science (68R10) Deterministic network models in operations research (90B10) Deterministic scheduling theory in operations research (90B35)
Cited In (1)
This page was built for publication: New heuristics for modeling temporal constraints and generating PERT network with minimum number of dummy-arcs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5223871)