Fuzzy analytic hierarchy process to a structure under 2-out-of-3:F modeling
From MaRDI portal
Publication:522419
DOI10.1007/s12597-016-0255-8zbMath1360.90315OpenAlexW2291417664MaRDI QIDQ522419
Publication date: 28 April 2017
Published in: Opsearch (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s12597-016-0255-8
Decision theory (91B06) Management decision making, including multiple objectives (90B50) Reliability, availability, maintenance, inspection in operations research (90B25) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (2)
Analysis of facility layout alternatives using proposed integrated approach ⋮ Strategy selection for multi-objective redundancy allocation problem in a k-out-of-n system considering the mean time to failure
Cites Work
- Unnamed Item
- Project selection by constrained fuzzy AHP
- Repairable consecutive-\(k\)-out-of-\(n\):\(F\) system with fuzzy states
- Modelling redundancy allocation for a fuzzy random parallel-series system
- Performance of a structure consisting a \(2\)-out-of-\(3:F\) substructure under human failure
- Fuzzy Bayesian system reliability assessment based on exponential distribution
- Fuzzy hierarchical analysis
- Imprecise reasoning in geographic information systems
- On smooth surfaces in projective four-space lying on quartic hypersurfaces with isolated singularities
- A structure-based software reliability allocation using fuzzy analytic hierarchy process
This page was built for publication: Fuzzy analytic hierarchy process to a structure under 2-out-of-3:F modeling