A new constraint programming approach for optimising a coal rail system
From MaRDI portal
(Redirected from Publication:523170)
Recommendations
Cites work
- A branch and bound algorithm for scheduling trains in a railway network
- A column generation approach to train timetabling on a corridor
- A constraint programming approach to the multiple-venue, sport-scheduling problem
- A constraint programming-based approach to the crew scheduling problem of the Taipei mass rapid transit system
- A job-shop scheduling approach for optimising sugarcane rail operations
- A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain
- An external-memory depth-first search algorithm for general grid graphs
- Bicriteria train scheduling for high-speed passenger railroad planning applications
- Determining operations affected by delay in predictive train timetables
- Energy efficient scheduling of open-pit coal mine trucks
- Global constraints for round robin tournament scheduling.
- Optimising a coal rail network under capacity constraints
- Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs
- Rescheduling rail networks with maintenance disruptions using problem space search
- Scheduling trains as a blocking parallel-machine job shop scheduling problem
Cited in
(9)- Cane railway scheduling via constraint logic programming: Labelling order and constraints in a real-life application
- A real-world mine excavators timetabling methodology in open-pit mining
- Rail capacity modelling with constraint programming
- COAL: A new heuristic approach for solving the fixed charge problem - computational results
- Optimising a coal rail network under capacity constraints
- Rail schedule optimisation in the hunter valley coal chain
- An efficient heuristic method for joint optimization of train scheduling and stop planning on double-track railway systems
- A resource constrained scheduling problem with multiple independent producers and a single linking constraint: a coal supply chain example
- A comparative study on three graph-based constructive algorithms for multi-stage scheduling with blocking
This page was built for publication: A new constraint programming approach for optimising a coal rail system