Train scheduling in a large and highly utilised railway network
From MaRDI portal
(Redirected from Publication:5232872)
Recommendations
- Design of a railway scheduling model for dense services
- A branch and bound algorithm for scheduling trains in a railway network
- Periodic railway timetabling with event flexibility
- Railway scheduling problems and their decomposition.
- Rescheduling Dense Train Traffic over Complex Station Interlocking Areas
Cites work
Cited in
(24)- Design of a railway scheduling model for dense services
- Mathematical solutions for solving periodic railway transportation
- Efficient scheduling of traffic on a railway line
- A logic-based Benders decomposition for microscopic railway timetable planning
- A sequencing approach for creating new train timetables
- A branch and bound algorithm for scheduling trains in a railway network
- A disjunctive graph model and framework for constructing new train schedules
- Patrol scheduling in urban rail network
- Periodic railway timetabling with event flexibility
- Scheduling trains on parallel lines with crossover points
- scientific article; zbMATH DE number 5343210 (Why is no real title available?)
- Generating train plans with problem space search
- Rescheduling Dense Train Traffic over Complex Station Interlocking Areas
- Knowledge-based system for railway scheduling
- scientific article; zbMATH DE number 2042677 (Why is no real title available?)
- scientific article; zbMATH DE number 1361561 (Why is no real title available?)
- Optimizing the simplon railway corridor
- scientific article; zbMATH DE number 915590 (Why is no real title available?)
- scientific article; zbMATH DE number 915593 (Why is no real title available?)
- Train scheduling in a large and highly utilised railway network
- Rail schedule optimisation in the hunter valley coal chain
- Scheduling of maintenance work of a large-scale tramway network
- Scheduling trains with small stretch on a unidirectional line
- Techniques for restricting multiple overtaking conflicts and performing compound moves when constructing new train schedules
This page was built for publication: Train scheduling in a large and highly utilised railway network
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5232872)