Two-machine open shop scheduling with deteriorating job to the number of tardy jobs
From MaRDI portal
Publication:5260673
Recommendations
- Two-machine job shop scheduling with deteriorating jobs
- Scheduling proportionally deteriorating jobs in two-machine open shop with a non-bottleneck machine
- Complexity analysis of job-shop scheduling with deteriorating jobs
- NP-hard cases in scheduling deteriorating jobs on dedicated machines
- Two-machine flow shop total tardiness scheduling problem with deteriorating jobs
Cited in
(3)
This page was built for publication: Two-machine open shop scheduling with deteriorating job to the number of tardy jobs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5260673)