A comparison of the performance of phase II simple linear profile control charts when parameters are estimated
DOI10.1080/03610918.2013.821484zbMATH Open1331.62377OpenAlexW1990200517MaRDI QIDQ5265800FDOQ5265800
Aya A. Aly, Mahmoud A. Mahmoud, William H. Woodall
Publication date: 29 July 2015
Published in: Communications in Statistics. Simulation and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610918.2013.821484
statistical process controlprofile monitoringestimation effectphase II analysisstandard deviation of average run length
Linear inference, regression (62J99) Applications of statistics in engineering and industry; control charts (62P30)
Cites Work
Cited In (12)
- Phase II monitoring of multivariate profiles with estimated parameters and optimal phase I subgroups
- Zone control charts with estimated parameters for detecting prespecified changes in linear profiles
- Double sampling np chart with estimated process parameter
- Phase II monitoring of logistic regression profiles with estimated parameters
- Monitoring multivariate profiles in multistage processes
- The effect of parameter estimation on phase II monitoring of poisson regression profiles
- New control charts for simultaneous monitoring of the mean vector and covariance matrix of multivariate multiple linear profiles
- Addressing the effect of parameter estimation on phase II monitoring of multivariate multiple linear profiles via a new cluster-based approach
- Phase I and phase II analysis of linear profile monitoring using robust estimators
- A generalized likelihood ratio test for monitoring profile data
- The exact method for designing the Maxwell chart with estimated parameter
- Synthetic exponential control charts with unknown parameter
Recommendations
- The performance of phase II simple linear profile approaches when parameters are estimated π π
- Addressing the effect of parameter estimation on phase II monitoring of multivariate multiple linear profiles via a new cluster-based approach π π
- The monitoring of simple linear regression profiles with two observations per sample π π
- Profile monitoring using nonparametric bootstrap \(T^2\) control chart π π
- Phase II Monitoring of Nonlinear Profiles π π
This page was built for publication: A comparison of the performance of phase II simple linear profile control charts when parameters are estimated
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5265800)