Bayesian estimation of the change point in a gamma process using X control chart
DOI10.1080/03610918.2015.1043386zbMATH Open1364.62065OpenAlexW2558740615MaRDI QIDQ5267920FDOQ5267920
Authors: M. Esmail Dehghan Monfared, Fazlollah Lak
Publication date: 13 June 2017
Published in: Communications in Statistics. Simulation and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03610918.2015.1043386
Recommendations
- Bayesian estimation of the change point using \(\bar X\) control chart
- Bayesian estimation of the change point using CUSUM control chart
- Bayesian estimation of the rate at which a process, monitored by anX̄chart, goes out of control
- Estimation of the Change Point in Monitoring the Process Mean and Variance
- Estimation of the Change Point in theX¯andSControl Charts
Point estimation (62F10) Bayesian inference (62F15) Applications of statistics in engineering and industry; control charts (62P30)
Cites Work
Cited In (4)
This page was built for publication: Bayesian estimation of the change point in a gamma process using \(\bar{X}\) control chart
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5267920)