Stochastic Target Hitting Time and the Problem of Early Retirement
From MaRDI portal
Publication:5273712
DOI10.1109/TAC.2004.824469zbMath1366.91136MaRDI QIDQ5273712
L. Spanjers, Yuanlie Lin, Kang Boda, Jerzy A. Filar
Publication date: 12 July 2017
Published in: IEEE Transactions on Automatic Control (Search for Journal in Brave)
Lua error in Module:PublicationMSCList at line 37: attempt to index local 'msc_result' (a nil value).
Related Items (14)
Constrained Markov decision processes with first passage criteria ⋮ A minimization problem of the risk probability in first passage semi-Markov decision processes with loss rates ⋮ Markov decision processes with average-value-at-risk criteria ⋮ Verification of discrete time stochastic hybrid systems: a stochastic reach-avoid decision problem ⋮ Threshold probability of non-terminal type in finite horizon Markov decision processes ⋮ Unnamed Item ⋮ Optimal investment, consumption and retirement choice problem with disutility and subsistence consumption constraints ⋮ Risk-Constrained Reinforcement Learning with Percentile Risk Criteria ⋮ Maximizing the probability of attaining a target prior to extinction ⋮ Time consistent dynamic risk measures ⋮ The optimal portfolios based on a modified safety-first rule with risk-free saving ⋮ Optimal portfolio, consumption and retirement decision under a preference change ⋮ Nonzero-sum stochastic games with probability criteria ⋮ STOCHASTIC SEQUENTIAL ASSIGNMENT PROBLEM WITH THRESHOLD CRITERIA
This page was built for publication: Stochastic Target Hitting Time and the Problem of Early Retirement