Comments on the Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
From MaRDI portal
Publication:5285758
DOI10.1287/MNSC.39.3.387zbMATH Open0776.90034OpenAlexW2151830000MaRDI QIDQ5285758FDOQ5285758
Authors: Shaoxiang Chen
Publication date: 29 June 1993
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.39.3.387
Recommendations
- Feasibility of scheduling lot sizes of two frequencies on one machine
- Feasibility of Scheduling Lot Sizes of Three Products on One Machine
- THE BALANCED LOT SIZE FOR A SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- Periodic scheduling problem for a production system
Cited In (1)
This page was built for publication: Comments on the Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5285758)