An optimal repair-replacement policy for a cold standby system with use priority
From MaRDI portal
Publication:534889
DOI10.1016/J.APM.2010.08.009zbMATH Open1211.90064OpenAlexW1973163515MaRDI QIDQ534889FDOQ534889
Authors: Yuanlin Zhang, Guanjun Wang
Publication date: 10 May 2011
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2010.08.009
Recommendations
- An optimal replacement policy for repairable cold standby system with priority in use
- Optimal replacement policy for a two-dissimilar-component cold standby system with different repair actions
- A bivariate optimal replacement policy for a cold standby repairable system with repair priority
- A geometric process repair model for a cold standby repairable system with imperfect delay repair and priority in use
- Replacement problems for a cold standby repairable system
Cites Work
- Title not available (Why is that?)
- Some results for repairable systems with general repair
- Imperfect repair
- Geometric processes and replacement problem
- Optimum Preventive Maintenance Policies
- A note on the optimal replacement problem
- Optimal Number of Minimal Repairs before Replacement
- Age-dependent minimal repair
- A geometrical process repair model for a repairable system with delayed repair
- A bivariate optimal replacement policy for a repairable system
- Optimal replacement policy for a deteriorating production system with preventive maintenance
- Optimal strategies for some repair replacement models
- Optimal replacement policy for a multistate repairable system
- A shock model with two-type failures and optimal replacement policy
- Analysis of a parallel system with two different units
- Replacement problems for a cold standby repairable system
- A geometric process model for \(M/M/1\) queueing system with a repairable service station
- Replacement Policies under Minimal Repair
- Reliability of consecutive-k-out-of-n:Grepairable system
- Analysis of a two-component series system with a geometric process model
- Repairable consecutive-k-out-of-n:F system with Markov dependence
- Title not available (Why is that?)
- A geometric process repair model for a series repairable system with \(k\)-dissimilar components
Cited In (11)
- Title not available (Why is that?)
- A bivariate optimal replacement policy for a cold standby repairable system with preventive repair
- A bivariate optimal replacement policy for a cold standby repairable system with repair priority
- Replacement problems for a cold standby repairable system
- Optimal completed work dependent loading of components in cold standby systems
- Mathematical modeling and performance analysis of machine repairable system with hot spares
- Availability and cost-benefit evaluation for a repairable retrial system with warm standbys and priority
- Optimal replacement policy for a two-dissimilar-component cold standby system with different repair actions
- A deteriorating cold standby repairable system with priority in use
- Optimizing replacement policy for a cold-standby system with waiting repair times
- Survey on queueing models with standbys support
This page was built for publication: An optimal repair-replacement policy for a cold standby system with use priority
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q534889)