A Non-Numerical Approach to Production Scheduling Problems
From MaRDI portal
(Redirected from Publication:5378663)
Recommendations
- Решение задачи календарного планирования производства в условиях стохастической неопределeнности параметров
- On a problem of production scheduling
- On the Stochastic Non-sequential Production-planning Problem
- Optimising lot sizing and order scheduling with non-linear production rates
- scientific article; zbMATH DE number 1045434
- An approximate dynamic programming approach for <scp>production‐delivery</scp> scheduling under non‐stationary demand
- A polyhedral approach to a production planning problem
- A note on a deterministic production scheduling model
Cited in
(20)- Two machine open shop scheduling problem to minimize an arbitrary machine usage regular penalty function
- On some geometric methods in scheduling theory: A survey
- The complexity of two-job shop problems with multi-purpose unrelated machines.
- Numetrix/3 production scheduling
- Deterministic job-shop scheduling: Past, present and future
- Parallel dedicated machines scheduling with chain precedence constraints
- Complexity of mixed shop scheduling problems: A survey
- A combinatorial analysis of the permutation and non-permutation flow shop scheduling problems
- A survey of job shop scheduling problem: the types and models
- Complexity of shop-scheduling problems with fixed number of jobs: a survey
- The set of solutions for Boolea n equations
- A Simulation-based Production Scheduling Method for Minimizing the Due-date-deviation
- scientific article; zbMATH DE number 3934747 (Why is no real title available?)
- The generalized scheduling problem for discrete production. II
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm
- scientific article; zbMATH DE number 1841981 (Why is no real title available?)
- Решение задачи календарного планирования производства в условиях стохастической неопределeнности параметров
- Minimizing the expected maximum lateness for a job shop subject to stochastic machine breakdowns
- Flow shop scheduling with inter-stage flexibility and blocking constraints
- The production scheduling problem in a multi-page invoice printing system
This page was built for publication: A Non-Numerical Approach to Production Scheduling Problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5378663)