Heuristic for no-wait flow shops with makespan minimization
From MaRDI portal
Publication:5385488
DOI10.1080/00207540701737997zbMath1160.90415OpenAlexW2119301502MaRDI QIDQ5385488
Qian Wang, Cheng Wu, Xiao-Ping Li
Publication date: 6 May 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540701737997
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items
Minimisation of total tardiness for identical parallel machine scheduling using genetic algorithm ⋮ An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time ⋮ An iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effects ⋮ A survey of scheduling problems with no-wait in process ⋮ Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion ⋮ Minimizing makespan for a no-wait flowshop using genetic algorithm
Cites Work