Multi-inspection time optimisation for a cracked component based on a updating reliability approach
DOI10.1080/17797179.2013.820899zbMATH Open1284.90016OpenAlexW1531005087MaRDI QIDQ5407316FDOQ5407316
Authors:
Publication date: 7 April 2014
Published in: European Journal of Computational Mechanics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/17797179.2013.820899
Recommendations
- Prediction of optimal inspection time for structural fatigue life
- Improved Planning In-Service Inspections of Fatigued Aircraft Structures Under Parametric Uncertainty of Underlying Lifetime Models
- Design of maintenance schedules for fatigue-prone metallic components using reliability-based optimization
- Reliability-based optimization of maintenance scheduling of mechanical components under fatigue
- scientific article; zbMATH DE number 1058127
optimisationresponse surfacefatigue crack growthfirst-order reliability methodinspection schedulingupdating reliability
Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35) Fracture and damage (74R99)
Cited In (5)
- Reliability-based optimization of maintenance scheduling of mechanical components under fatigue
- Optimal Inspection Period for Structures Subjected to Fatigue
- Prediction of optimal inspection time for structural fatigue life
- Switching to doubled aircraft inspection frequency strategy analysis for exponential fatigue crack growth model
- Design of maintenance schedules for fatigue-prone metallic components using reliability-based optimization
This page was built for publication: Multi-inspection time optimisation for a cracked component based on a updating reliability approach
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5407316)