Production control and combined discrete/continuous simulation modeling in failure-prone transfer lines
DOI10.1080/00207540600920868zbMATH Open1145.90371OpenAlexW2107074395MaRDI QIDQ5451187FDOQ5451187
Authors:
Publication date: 18 March 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: http://espace2.etsmtl.ca/id/eprint/1892/1/Production-control-and-combined-discretecontinuous-simulation-modeling-in-failure-prone-transfer-lines.pdf
Recommendations
- Evaluation and optimization of two-stage continuous transfer lines subject to time-dependent failures
- Control policy simulation based on machine age in a failure prone one-machine, one-product manufacturing system
- The validity of aggregation in the study of unreliable continuous transfer lines
- Publication:5750699
- An efficient discrete event model of assembly/disassembly production networks
simulationdesign of experimentsoptimal controlstochastic controltransfer linesmanufacturing systems control
Cites Work
- Optimal control of production rate in a failure prone manufacturing system
- Approximate analysis of transfer lines with unreliable machines and finite buffers
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
- Efficient algorithms for buffer space allocation
- Experimental design in production and maintenance control problem of a single machine, single product manufacturing system
- Optimal feedback production planning in a stochastic \(N\)-machine flowshop
- Short-term robustness of production management systems: A case study.
- Optimal feedback production planning in a stochastic two-machine flowshop
- An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers
- Decomposition/Aggregation-Based Dynamic Programming Optimization of PartiallyHomogeneous UnreliableTransfer Lines
Cited In (3)
This page was built for publication: Production control and combined discrete/continuous simulation modeling in failure-prone transfer lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5451187)