Effects of imperfect products on lot sizing with work in process inventory
From MaRDI portal
Publication:545981
DOI10.1016/j.amc.2011.03.023zbMath1231.90051OpenAlexW2092328998MaRDI QIDQ545981
Mehdi Bijari, Morteza Rasti Barzoki, Morteza Jahanbazi
Publication date: 24 June 2011
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2011.03.023
Related Items (6)
A joint optimal ordering and delivery policy for an integrated supplier-retailer inventory model with trade credit and defective items ⋮ A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering ⋮ Optimizing inventory decisions in a two-level supply chain with order quantity constraints ⋮ Pseudo-polynomial dynamic programming for an integrated due date assignment, resource allocation, production, and distribution scheduling model in supply chain scheduling ⋮ A production: inventory model for defective items with shortages incorporating inflation and time value of money ⋮ Economic production quantity model with repair failure and limited capacity
Cites Work
- Lot sizing with random yield and different qualities
- On optimal batch sizing in a multi-stage production system with rework consideration
- Expected number analysis of a two-server queueing network subject to inter-stage inspection and rework
- Optimal batch sizing in a multi-stage production system with rework consideration
- Integrated inventory control and inspection policies with deterministic demand
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
This page was built for publication: Effects of imperfect products on lot sizing with work in process inventory