Heuristic approach for solving the multi-objective facility layout problem
From MaRDI portal
Publication:5478795
DOI10.1080/00207540500056383zbMath1094.90019MaRDI QIDQ5478795
No author found.
Publication date: 13 July 2006
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540500056383
consistency; paired comparison; multi-objective facility layout (MOFL) problem; multi-pass halving and doubling procedure
90B50: Management decision making, including multiple objectives
90C59: Approximation methods and heuristics in mathematical programming
90B80: Discrete location and assignment
Related Items
A knowledge-based heuristic particle swarm optimization approach with the adjustment strategy for the weighted circle packing problem, The reliable design of one-piece flow production system using fuzzy ant colony optimization, Solving multi objective facility layout problem by modified simulated annealing, Dynamic facility layout problem based on open queuing network theory, Multi-level departments-to-offices assignment with different room types, An improved heuristic approach for multi-objective facility layout problem, Further analysis on matrix operation of AHP
Cites Work
- A note on the analysis of subjective judgement matrices
- The facility layout problem
- Consistent weights for judgements matrices on the relative importance of alternatives
- A scaling method for priorities in hierarchical structures
- Intelligent local search strategies for solving facility layout problems with the quadratic assignment problem formulation
- The geometric mean procedure for estimating the scale of a judgement matrix
- Multiple criteria approach to the facilities layout problem
- Multiple objective programming for the quadratic assignment problem
- A design approach to the multi-objective facility layout problem