scientific article; zbMATH DE number 5052107
From MaRDI portal
Publication:5486497
zbMATH Open1183.90165MaRDI QIDQ5486497FDOQ5486497
Publication date: 11 September 2006
Title of this publication is not available (Why is that?)
Recommendations
- Title not available (Why is that?) π π
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem π π
- Makespan minimization flowshop with position dependent job processing times -- computational complexity and solution algorithms π π
- Minimizing Makespan In Flowshops With Pallet Requirements: Computational Complexity π π
- A new three-machine shop scheduling: complexity and approximation algorithm π π
- A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtime π π
- A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan π π
- Title not available (Why is that?) π π
- Three-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times π π
- Algorithms for three-machine flowshop scheduling problem to minimize makespan with uncertain processing times π π
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5486497)