Distribution of the Time Through a Directed, Acyclic Network

From MaRDI portal
Publication:5511895

DOI10.1287/opre.13.1.46zbMath0137.39302OpenAlexW2002460920MaRDI QIDQ5511895

No author found.

Publication date: 1965

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.13.1.46



Related Items

Risk taking in stochastic PERT networks, The most critical path in a PERT network: A heuristic approach, Computing project makespan distributions: Markovian PERT networks revisited, Unnamed Item, Reliability function of a class of time-dependent systems with standby redundancy, Longest path analysis in networks of queues: dynamic scheduling problems, Modelling complex assemblies as a queueing network for lead time control, Probabilistic shortest path problems with budgetary constraints, Evolutionary algorithms for multi-objective stochastic resource availability cost problem, Stochastic PERT networks as models of cognition: Derivation of the mean, variance, and distribution of reaction time using order-of-processing (OP) diagrams, Berechnung stochastischer Termine, A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network, A Note on Bounds for the Moments of a Stochastic Project Planniag Model Duration, Adjustment of the moments of the project completion times when activity times are exponentially distributed, A new probabilistic approach to the path criticality in stochastic PERT, A new approach to determine the critical path in stochastic activity network, A factoring approach for the stochastic shortest path problem, Finding the shortest path in stochastic networks, A new approximation algorithm for obtaining the probability distribution function for project completion time, Lower bound for the mean project completion time in dynamic PERT networks, A heuristic procedure for solving the dynamic probabilistic project expediting problem, Using earned value management and schedule risk analysis with resource constraints for project control, The exact overall time distribution of a project with uncertain task durations, Time-cost trade-off via optimal control theory in Markov PERT networks, On computing the distribution function of the sum of independent random variables, A multi-objective resource allocation problem in PERT networks, Global optima results for the Kauffman \(NK\) model, Some remarks on the expected delay of project duration in a PERT network, Stochastic networks and the extreme value distribution, Using schedule risk analysis with resource constraints for project control, Stochastic gradient-based time-cost tradeoffs in PERT networks using simulation, The expected length of a shortest path, Project risk management from the bottom-up: activity risk index, Estimating the distribution function of a transformed random vector, The use of cutsets in Monte Carlo analysis of stochastic networks, Due date assignment for multistage assembly systems, A Generic Algorithm for Approximately Solving Stochastic Graph Optimization Problems, Risk-Averse Shortest Path Interdiction, Stochastic and fuzzy PERT, The bias of an estimate of coupled slack in stochastic PERT networks, Approximating the longest path length of a stochastic DAG by a normal distribution in linear time, Path critical index and activity critical index in PERT networks, On criticality and sensitivity in activity networks, Selective influence and response time cumulative distribution functions in serial-parallel task networks., A new structural mechanism for reducibility of stochastic PERT networks, Optimal control of service rates and arrivals in Jackson networks, Dynamic shortest path in stochastic dynamic networks: Ship routing problem