A note on a paper by W. Szwarc
From MaRDI portal
Publication:5621267
DOI10.1002/nav.3800180114zbMath0217.27301MaRDI QIDQ5621267
No author found.
Publication date: 1971
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800180114
90C10: Integer programming
90B35: Deterministic scheduling theory in operations research
90B70: Theory of organizations, manpower planning in operations research
Related Items
Non-bottleneck machines in three-machine flow shops, Two- and three-machine flow shop scheduling problems with equal sized transfer batches
Cites Work