Single-Server, Two-Machine Sequencing with Switching Time
From MaRDI portal
Publication:5650500
DOI10.1287/opre.20.1.24zbMath0238.90033OpenAlexW2043778878MaRDI QIDQ5650500
Publication date: 1972
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.20.1.24
Related Items
One-machine batching and sequencing of multiple-type items, Batch scheduling to minimize total completion time, Unrelated parallel machine scheduling with new criteria: complexity and models, Scheduling with multiple servers, Minimizing total weighted completion time approximately for the parallel machine problem with a single server, Scheduling two job classes on a single machine, Parallel machine scheduling problems with a single server, A heuristic approach for single-machine scheduling with due dates and class setups., Scheduling parallel machines with a single server: Some solvable cases and heuristics, Scheduling two parallel semiautomatic machines to minimize machine interference