Optimum Production Scheduling of Multicommodity in Flow Line
From MaRDI portal
Publication:5652439
Cited in
(7)- A polynomial algorithm for lot-size scheduling of two type tasks.
- Lot-size scheduling of two types of jobs on identical machines
- A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem
- Studying the effects of production loss due to setup in dynamic production scheduling
- Analytical study on multi-product production planning with outsourcing
- Impact of sequence-dependent setup time on job shop scheduling performance
- A Lagrangean decomposition solution to a single line multiproduct scheduling problem
This page was built for publication: Optimum Production Scheduling of Multicommodity in Flow Line
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5652439)