Optimum Production Scheduling of Multicommodity in Flow Line
From MaRDI portal
Publication:5652439
DOI10.1109/TSMC.1972.4309158zbMath0241.90028MaRDI QIDQ5652439
Publication date: 1972
Published in: IEEE Transactions on Systems, Man, and Cybernetics (Search for Journal in Brave)
Related Items
A Lagrangean decomposition solution to a single line multiproduct scheduling problem ⋮ Lot-size scheduling of two types of jobs on identical machines ⋮ Analytical study on multi-product production planning with outsourcing ⋮ Impact of sequence-dependent setup time on job shop scheduling performance ⋮ A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem ⋮ A polynomial algorithm for lot-size scheduling of two type tasks. ⋮ Studying the effects of production loss due to setup in dynamic production scheduling
This page was built for publication: Optimum Production Scheduling of Multicommodity in Flow Line