Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
New item
In other projects
MaRDI portal item
Discussion
View source
View history
English
Log in

Optimal Scheduiing of Two Consecutive Idle Periods

From MaRDI portal
Publication:5653784
Jump to:navigation, search

DOI10.1287/MNSC.19.1.71zbMATH Open0242.90021OpenAlexW1996871477MaRDI QIDQ5653784FDOQ5653784

Author name not available (Why is that?)

Publication date: 1972

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.19.1.71




Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)



Cited In (11)

  • An efficient two-phase algorithm for cyclic days-off scheduling.
  • The cyclical scheduling problem
  • Using compressed workweeks to save labour cost
  • A class of manpower scheduling problems
  • Enhancing an algorithm for set covering problems
  • A resource type analysis of the integrated project scheduling and personnel staffing problem
  • A survey of dynamic network flows
  • Staff scheduling at the United States postal Service
  • A cyclic integer covering problem
  • Optimum manpower models for a production system with varying production rates
  • A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE






This page was built for publication: Optimal Scheduiing of Two Consecutive Idle Periods

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5653784)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:5653784&oldid=40681172"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 28 March 2025, at 08:16. Warning: Page may not contain recent updates.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki