Economic Lot Size Determination in Multi-Stage Assembly Systems
From MaRDI portal
Publication:5665003
DOI10.1287/mnsc.19.5.517zbMath0251.90013MaRDI QIDQ5665003
Jack F. Williams, Wallace B. Crowston, Michael H. Wagner
Publication date: 1973
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.19.5.517
90B05: Inventory, storage, reservoirs
Related Items
A note on the problem of scheduling a flexible manufacturing system for Just-in-time customers, The impact of OPT and TPM on the economic production quantity, The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops., The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic, Production scheduling and sequencing for multi-stage production systems, A dual algorithm for the economic lot-sizing problem, Integrated procurement-production systems: A review, Abstimmung von Produktions- und Transportlosgrößen zwischen Zulieferer und Produzent. Eine Analyse auf der Grundlage stationärer Losgrößenmodelle, A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes, A heuristic method for lot-sizing in multi-stage systems, Improved heuristic methods for multiple stage production planning., Integrated production/distribution planning in supply chains: An invited review, The application of valid inequalities to the multi-stage lot-sizing problem, Echelon stock formulation for multi-stage lot-sizing with component lead times, Unnamed Item