Scheduling a Multi-Product Single Machine System
From MaRDI portal
Publication:5671772
DOI10.1057/jors.1973.43zbMath0256.90024OpenAlexW2090974966MaRDI QIDQ5671772
No author found.
Publication date: 1973
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1973.43
Related Items
A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes ⋮ The economic lot scheduling problem: a pure genetic search approach ⋮ A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints ⋮ The G-group heuristic for single machine lot scheduling ⋮ Multi-stage production-inventory systems ⋮ Economic operating policy and variations in production load ⋮ Determination of economic production quantities for a two-product single machine system ⋮ Multi-stage production/inventory deterministic lot size computations ⋮ An improved algorithm for solving the economic lot size problem (ELSP) ⋮ The economic lot scheduling problem without capacity constraints ⋮ The economic lot scheduling problem under power-of-two policy ⋮ High Multiplicity Scheduling with Switching Costs for Few Products ⋮ Cyclic lot-sizing problems with sequencing costs ⋮ Optimization of the decentralized cash management problem