Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties
DOI10.1002/(SICI)1520-6750(199612)43:8%3C1127::AID-NAV5%3E3.0.CO;2-GzbMATH Open0871.90043OpenAlexW1976534804MaRDI QIDQ5690159FDOQ5690159
Authors: Xiaoqiang Cai, Fengsheng Tu
Publication date: 15 January 1997
Full work available at URL: https://doi.org/10.1002/(sici)1520-6750(199612)43:8%3C1127::aid-nav5%3E3.0.co;2-g
Recommendations
- Scheduling jobs on a machine subject to stochastic breakdowns to minimize absolute early-tardy penalties
- Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties
- The single-machine absolute-deviation early-tardy problem with random completion times
- Stochastic scheduling on parallel machines subject to random breakdowns to minimize expected costs for earliness and tardy jobs
- Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities
Deterministic scheduling theory in operations research (90B35) Stochastic systems in control theory (general) (93E03)
Cited In (11)
- Scheduling jobs on a machine subject to stochastic breakdowns to minimize absolute early-tardy penalties
- Asymmetric earliness and tardiness scheduling with exponential processing times on an unreliable machine
- Single machine scheduling with stochastic processing times or stochastic due-date to minimize the number of early and tardy jobs
- Stochastic single machine scheduling subject to machines breakdowns with quadratic early-tardy penalties for the preemptive-repeat model
- Due-window assignment scheduling problem with stochastic processing times
- Job sequencing and due date assignment in a single machine shop with uncertain processing times
- STOCHASTIC SCHEDULING WITH ASYMMETRIC EARLINESS AND TARDINESS PENALTIES UNDER RANDOM MACHINE BREAKDOWNS
- Stochastic scheduling on parallel machines subject to random breakdowns to minimize expected costs for earliness and tardy jobs
- Single machine stochastic JIT scheduling problem subject to machine breakdowns
- Scheduling problems with random processing times under expected earliness/tardiness costs
- Single–machine scheduling with random machine breakdowns and randomly compressible processing times
This page was built for publication: Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5690159)