Utilizing Weibull Failure Rates in Repair Limit Analysis for Equipment Replacement/Preventive Maintenance Decisions
From MaRDI portal
Publication:5690273
DOI10.1057/jors.1996.172zbMath0863.90069OpenAlexW2063182316MaRDI QIDQ5690273
No author found.
Publication date: 12 June 1997
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1996.172
preventive maintenanceequipment replacementvehicle replacementequipment maintenancerepair limit analysisstate-dependent repair limits
Related Items (10)
The optimal economic lifetime of vintage capital in the presence of operating costs, technological progress, and learning ⋮ Optimization problem for the integral model of developing systems ⋮ Influence of economic indices on the solution to the optimization problem of the age structure of power plants equipment ⋮ A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times ⋮ The Lorenz Transform approach to the Optimal Repair-Cost limit remplacement Policy with Imperfect Repair ⋮ Statistical estimation algorithms for repairs-time limit replacement scheduling under earning rate criteria ⋮ Hybrid approach to the rational management of machine replacement ⋮ DISCRETE REPAIR-COST LIMIT REPLACEMENT POLICIES WITH/WITHOUT IMPERFECT REPAIR ⋮ Numerical solution of the age structure optimization problem for basic types of power plants ⋮ A survey of maintenance policies of deteriorating systems
This page was built for publication: Utilizing Weibull Failure Rates in Repair Limit Analysis for Equipment Replacement/Preventive Maintenance Decisions