scientific article; zbMATH DE number 2219280
From MaRDI portal
Publication:5697973
zbMATH Open1079.90064MaRDI QIDQ5697973FDOQ5697973
Authors: Weijun Xia, Zhiming Wu
Publication date: 27 October 2005
Title of this publication is not available (Why is that?)
Recommendations
- Hybrid particle-swarm optimization for the multi-objective flexible job-shop scheduling problem
- Hybrid Pareto-based particle swarm optimization for multi-objective flexible job shop scheduling problems
- A hybrid particle swarm optimisation for multi-objective flexible job-shop scheduling problem with dual-resources constrained
- A hybrid particle swarm optimization algorithm for job-shop scheduling problem
- Study on particle swarm algorithm for job shop scheduling problems
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cited In (16)
- Hybrid simulated annealing and genetic algorithms for industrial production management problems
- A particle swarm optimization algorithm for the multi-objective flexible job-shop scheduling problem
- Improved particle swarm optimization algorithm based novel encoding and decoding schemes for flexible job shop scheduling problem
- Hybrid Particle Swarm Optimizers in the Single Machine Scheduling Problem: An Experimental Study
- A research survey: review of flexible job shop scheduling techniques
- Hybrid particle-swarm optimization for the multi-objective flexible job-shop scheduling problem
- Hybrid Pareto-based particle swarm optimization for multi-objective flexible job shop scheduling problems
- Title not available (Why is that?)
- A new particle swarm optimization for multi-objective open shop scheduling
- A priority-based genetic algorithm for a flexible job shop scheduling problem
- A hybrid particle swarm optimisation for multi-objective flexible job-shop scheduling problem with dual-resources constrained
- Title not available (Why is that?)
- Multi-objective two-stage multiprocessor flow shop scheduling – a subgroup particle swarm optimisation approach
- Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time
- On the Effectiveness of Particle Swarm Optimization and Variable Neighborhood Descent for the Continuous Flow-Shop Scheduling Problem
- A neighbourhood property for the job shop scheduling problem with application to hybrid particle swarm optimization
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5697973)