Dominance of Cyclic Solutions and Challenges in the Scheduling of Robotic Cells
From MaRDI portal
Publication:5713153
DOI10.1137/S003614450444138XzbMath1080.90063OpenAlexW3124296027MaRDI QIDQ5713153
H. Neil Geismar, Milind W. Dawande, Suresh P. Sethi
Publication date: 12 December 2005
Published in: SIAM Review (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1137/s003614450444138x
Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27) Discrete-time control/observation systems (93C55) Artificial intelligence for robotics (68T40)
Related Items
Declarative Modeling for Multimodal Processes Driven Distribution Networks ⋮ A note on productivity gains in flexible robotic cells ⋮ Cyclic scheduling of parts and robot moves in \(m\)-machine robotic cells ⋮ Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions ⋮ On the existence of dominating 6-cyclic schedules in four-machine robotic cells ⋮ Cyclic scheduling of a 2-machine robotic cell with tooling constraints ⋮ Transporting jobs through a two‐machine open shop