Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: A Mine Planning Case Study
DOI10.1007/978-3-319-18008-3_7zbMath1459.90089OpenAlexW857490637MaRDI QIDQ5741459
Adrian R. Pearce, Christina Burt, Nir Lipovetzky, Peter J. Stuckey
Publication date: 25 July 2016
Published in: Integration of AI and OR Techniques in Constraint Programming (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-319-18008-3_7
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Problem solving in the context of artificial intelligence (heuristics, search strategies, etc.) (68T20)
This page was built for publication: Scheduling with Fixed Maintenance, Shared Resources and Nonlinear Feedrate Constraints: A Mine Planning Case Study