scientific article; zbMATH DE number 7430694
From MaRDI portal
Publication:5860412
zbMath1474.90020MaRDI QIDQ5860412
No author found.
Publication date: 19 November 2021
Full work available at URL: https://ojs.ictp.it/jnms/index.php/jnms/article/view/49
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
reliabilityPontryagin's maximum principlereworkimperfect productionmulti-objective inventory control problem
Multi-objective and goal programming (90C29) Inventory, storage, reservoirs (90B05) Environmental economics (natural resource models, harvesting, pollution, etc.) (91B76)
Related Items (1)
Uses Software
Cites Work
- Unnamed Item
- Product inspection policy for an imperfect production system with inspection errors and warranty cost
- The EOQ model -- a dynamical system
- An EOQ model of homogeneous products while demand is salesmen's initiatives and stock sensitive
- Numerical approach of multi-objective optimal control problem in imprecise environment
- Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
- A production-inventory model in an imperfect production process
- An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments
- A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
- A numerical approach to a multi-objective optimal inventory control problem for deteriorating multi-items under fuzzy inflation and discounting
- Three-layer supply chain - A production-inventory model for reworkable items
- Advertisement Policy, Reliability Dependent Imperfect Production and Environmental Pollution Control Problem in Fuzzy-Rough Environment
- Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality
This page was built for publication: