A 3-approximation list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource and total weighted completion time criterion
From MaRDI portal
Publication:5876237
zbMATH Open1506.90100arXiv2105.04735MaRDI QIDQ5876237FDOQ5876237
Authors: Susumu Hashimoto, Shinji Mizuno
Publication date: 31 January 2023
Abstract: This paper studies a single-machine scheduling problem with a non-renewable resource (NR-SSP) and total weighted completion time criterion. The non-renewable resource is consumed when the machine starts processing a job. We consider the case where each job's weight in the objective function is proportional to its resource consumption amount. The problem is known to be NP-hard in this case. We propose a 3-approximation list scheduling algorithm for this problem. Besides, we show that the approximation ratio 3 is tight for the algorithm.
Full work available at URL: https://arxiv.org/abs/2105.04735
Recommendations
- A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource
- Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints
- Scheduling with non-renewable resources: minimizing the sum of completion times
- New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints
- Approximation schemes for single machine scheduling with non-renewable resource constraints
Cited In (5)
- Scheduling with non-renewable resources: minimizing the sum of completion times
- New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints
- Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints
- Scheduling with non-renewable resources: minimizing the sum of completion times
- A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource
This page was built for publication: A 3-approximation list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource and total weighted completion time criterion
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5876237)