Balancing Just-In-Time Production Units: TheNU-Line Balancing Problem
From MaRDI portal
Publication:5888074
Recommendations
- ULINO: Optimally balancing U-shaped JIT assembly lines
- Balancing and sequencing mixed-model just-in-time U-lines with multiple objectives
- An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
- scientific article; zbMATH DE number 4072694
- scientific article; zbMATH DE number 7145158
- Note. Optimal balancing of U-shaped assembly lines
- On the MILP model for the U-shaped assembly line balancing problems
- The stochastic U-line balancing problem
- Maximizing the production rate in simple assembly line balancing -- A branch and bound procedure
- Procedures for the time and space constrained assembly line balancing problem
Cited in
(9)- A versatile algorithm for assembly line balancing
- Multi-objective parallel adjacent U-shaped assembly line balancing collaborated by robots and normal and disabled workers
- A classification of assembly line balancing problems
- A survey of the parallel assembly lines balancing problem
- A survey on problems and methods in generalized assembly line balancing
- An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
- ULINO: Optimally balancing U-shaped JIT assembly lines
- Heuristic and metaheuristic procedures for the buffer sizing problem in parallel assembly lines balancing problem with multi-line workstations and different cycle times
- Balancing U-lines in a multiple U-line facility
This page was built for publication: Balancing Just-In-Time Production Units: TheNU-Line Balancing Problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5888074)