Balancing Just-In-Time Production Units: TheNU-Line Balancing Problem
From MaRDI portal
Publication:5888074
DOI10.1080/03155986.1998.11732360OpenAlexW2402439713MaRDI QIDQ5888074
Publication date: 21 April 2023
Published in: INFOR: Information Systems and Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/03155986.1998.11732360
Related Items (6)
A classification of assembly line balancing problems ⋮ Multi-objective parallel adjacent U-shaped assembly line balancing collaborated by robots and normal and disabled workers ⋮ A versatile algorithm for assembly line balancing ⋮ A survey of the parallel assembly lines balancing problem ⋮ Heuristic and metaheuristic procedures for the buffer sizing problem in parallel assembly lines balancing problem with multi-line workstations and different cycle times ⋮ A survey on problems and methods in generalized assembly line balancing
This page was built for publication: Balancing Just-In-Time Production Units: TheNU-Line Balancing Problem