Integrated production planning and preventive maintenance in deteriorating production systems
From MaRDI portal
Publication:5892261
DOI10.1016/J.INS.2014.03.097zbMath1354.90044OpenAlexW2077548276MaRDI QIDQ5892261
Farouk Yalaoui, Alice Yalaoui, Khalil Chaabi
Publication date: 2 February 2017
Published in: Information Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ins.2014.03.097
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (2)
Simultaneous production and maintenance planning for a single capacitated resource facing both a dynamic demand and intensive wear and tear ⋮ Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures
Cites Work
- A fuzzy control system with application to production planning problems
- An integrated production and preventive maintenance planning model
- Hedging point policy improvement
- The multi-item capacitated lot-sizing problem with setup times and shortage costs
- Optimal maintenance models for systems subject to failure–A Review
- Integrated production planning and preventive maintenance in deteriorating production systems
- Unnamed Item
- Unnamed Item
This page was built for publication: Integrated production planning and preventive maintenance in deteriorating production systems