Scheduling spares with exponential lifetimes in a two‐component parallel system
From MaRDI portal
Publication:5896406
DOI10.1002/NAV.3800310309zbMath0544.90045OpenAlexW1969438793MaRDI QIDQ5896406
Publication date: 1984
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800310309
Reliability, availability, maintenance, inspection in operations research (90B25) Reliability and life testing (62N05)
Related Items (2)
Stochastic scheduling on parallel machines to minimize discounted holding costs ⋮ Loading and Sequencing on Parallel Machines
This page was built for publication: Scheduling spares with exponential lifetimes in a two‐component parallel system