The integer EOQ repair and waste disposal model---further analysis
From MaRDI portal
Publication:5949875
zbMath0981.90064MaRDI QIDQ5949875
Publication date: 5 December 2001
Published in: CEJOR. Central European Journal of Operations Research (Search for Journal in Brave)
production; reverse logistics; remanufacturing; cost minimisation; EOQ model; quasi-convex program; waste disposal
90C90: Applications of mathematical programming
90B25: Reliability, availability, maintenance, inspection in operations research
90B30: Production models
Related Items
How to Control a Reverse Logistics System When Used Items Return with Diminishing Quality, Design of contract parameters in a closed-loop supply chain, Optimal control of production and remanufacturing in a reverse logistics model with backlogging, A production-repairing inventory model with fuzzy rough coefficients under inflation and time value of money, Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options, Lot sizing for a single product recovery system with variable setup numbers, A two storage production-repairing model with fuzzy defective rate and displayed inventory dependent demand