Critical path analysis in the network with fuzzy activity times

From MaRDI portal
Publication:5951737

DOI10.1016/S0165-0114(00)00076-2zbMath1015.90096WikidataQ127724978 ScholiaQ127724978MaRDI QIDQ5951737

Stefan Chanas, Paweł Zieliński

Publication date: 7 January 2002

Published in: Fuzzy Sets and Systems (Search for Journal in Brave)




Related Items (28)

Fuzzy critical path method based on ranking methods using hexagonal fuzzy numbers for decision makingAnalysis of critical paths in a project network with fuzzy activity timesOn combinatorial optimization problems on matroids with uncertain weightsApplying fuzzy method for measuring criticality in project networkA heuristic method for RCPSP with fuzzy activity timesProject scheduling problem with fuzzy activity durations: a novel operational law based solution frameworkModeling and simulation of project management through the PMBOK\(^{\circledR}\) standard using complex networksFuzzy shortest path problems incorporating interactivity among paths.Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters.Intuitionistic fuzzy multi-criteria group decision making with an application to critical path selectionA fuzzy time-dependent project scheduling problemSolution of interval PERT/CPM network problems by a simplified tabular methodOn computing the latest starting times and floats of activities in a network with imprecise durationsA path enumeration approach for the analysis of critical activities in fuzzy networksOn the latest starting times and criticality of activities in a network with imprecise durationsThe computational complexity of the criticality problems in a network with interval activity timesA minmax regret approach to the critical path method with task interval timesA New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project NetworkThe minimum spanning tree problem with fuzzy costsA simple approach to fuzzy critical path analysis in project networksComputing latest starting times of activities in interval-valued networks with minimal time lagsUsing stochastic decision networks to assess costs and completion times of refurbishment work in constructionDeveloping a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networksUsing metric distance ranking method to find intuitionistic fuzzy critical pathProject management decisions using fuzzy linear programmingFuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledgeOn latest starting times and floats in activity networks with ill-known durationsOn the hardness of evaluating criticality of activities in a planar network with duration intervals



Cites Work


This page was built for publication: Critical path analysis in the network with fuzzy activity times