Critical path analysis in the network with fuzzy activity times
From MaRDI portal
Publication:5951737
DOI10.1016/S0165-0114(00)00076-2zbMath1015.90096WikidataQ127724978 ScholiaQ127724978MaRDI QIDQ5951737
Stefan Chanas, Paweł Zieliński
Publication date: 7 January 2002
Published in: Fuzzy Sets and Systems (Search for Journal in Brave)
decision analysiscritical pathcritical path methodfuzzy CPMfuzzy criticalityfuzzy PERTinterval criticality
Programming involving graphs or networks (90C35) Deterministic network models in operations research (90B10) Theory of fuzzy sets, etc. (03E72) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (28)
Fuzzy critical path method based on ranking methods using hexagonal fuzzy numbers for decision making ⋮ Analysis of critical paths in a project network with fuzzy activity times ⋮ On combinatorial optimization problems on matroids with uncertain weights ⋮ Applying fuzzy method for measuring criticality in project network ⋮ A heuristic method for RCPSP with fuzzy activity times ⋮ Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework ⋮ Modeling and simulation of project management through the PMBOK\(^{\circledR}\) standard using complex networks ⋮ Fuzzy shortest path problems incorporating interactivity among paths. ⋮ Possible and necessary optimality of solutions in the single machine scheduling problem with fuzzy parameters. ⋮ Intuitionistic fuzzy multi-criteria group decision making with an application to critical path selection ⋮ A fuzzy time-dependent project scheduling problem ⋮ Solution of interval PERT/CPM network problems by a simplified tabular method ⋮ On computing the latest starting times and floats of activities in a network with imprecise durations ⋮ A path enumeration approach for the analysis of critical activities in fuzzy networks ⋮ On the latest starting times and criticality of activities in a network with imprecise durations ⋮ The computational complexity of the criticality problems in a network with interval activity times ⋮ A minmax regret approach to the critical path method with task interval times ⋮ A New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project Network ⋮ The minimum spanning tree problem with fuzzy costs ⋮ A simple approach to fuzzy critical path analysis in project networks ⋮ Computing latest starting times of activities in interval-valued networks with minimal time lags ⋮ Using stochastic decision networks to assess costs and completion times of refurbishment work in construction ⋮ Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks ⋮ Using metric distance ranking method to find intuitionistic fuzzy critical path ⋮ Project management decisions using fuzzy linear programming ⋮ Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge ⋮ On latest starting times and floats in activity networks with ill-known durations ⋮ On the hardness of evaluating criticality of activities in a planar network with duration intervals
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- The use of fuzzy variables in PERT
- Using fuzzy set theory in a scheduling problem: A case study
- Stochastic and fuzzy PERT
- Application of fuzzy distributions on project management
- Fuzzy-Network Planning - FNET
- Critical-Path Planning and Scheduling: Mathematical Basis
- Operations on fuzzy numbers
- Application of a Technique for Research and Development Program Evaluation
This page was built for publication: Critical path analysis in the network with fuzzy activity times