Workface planning in synchronous production systems
From MaRDI portal
Publication:5953343
DOI10.1016/S0377-2217(01)00056-XzbMath1008.90017OpenAlexW2063629039MaRDI QIDQ5953343
Xiaoqiang Cai, Chung-Yee Lee, George L. Vairaktarakis
Publication date: 23 January 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(01)00056-x
Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (4)
Optimal workforce assignment to operations of a paced assembly line ⋮ Heuristics for workforce planning with worker differences ⋮ Minimizing the number of workers in a paced mixed-model assembly line ⋮ Cyclic job scheduling in paced assembly lines with cross-trained workers
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Approximation Algorithms for the Assembly Line Crew Scheduling Problem
- Permuting Elements Within Columns of a Matrix in Order to Minimize Maximum Row Sum
- Technical Note—Searchability of the Composite and Multiple Surrogate Dual Functions
- The Lagrangian Relaxation Method for Solving Integer Programming Problems
- Surrogate Constraint Duality in Mathematical Programming
- On the Complexity of Timetable and Multicommodity Flow Problems
- Flowshop and Jobshop Schedules: Complexity and Approximation
- Workforce Planning in Mixed Model Assembly Systems
- Dual criteria preemptive open-shop problems with minimum makespan
- Design for Synchronized Flow Manufacturing
This page was built for publication: Workface planning in synchronous production systems