Single machine batch scheduling with resource dependent setup and processing times
DOI10.1016/S0377-2217(00)00312-XzbMATH Open1077.90525OpenAlexW1995788800WikidataQ127946120 ScholiaQ127946120MaRDI QIDQ5954835FDOQ5954835
Authors: T. C. Edwin Cheng, Adam Janiak, M. Y. Kovalyov
Publication date: 2001
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(00)00312-x
Recommendations
- Single machine scheduling with batch-dependent setup times
- Single machine batch scheduling with deadlines and resource dependent processing times
- Single machine scheduling problems with resource dependent processing times
- Single-machine scheduling with time-and-resource-dependent processing times
- Single machine group scheduling with resource dependent setup and processing times
- Single machine scheduling subject to deadlines and resource dependent processing times
- Single machine scheduling with resource dependent release times and processing times
- Single machine group scheduling with resource dependent setup times
- scientific article; zbMATH DE number 1859296
- Single machine serial-batching scheduling with independent setup time and deteriorating job processing times
Deterministic scheduling theory in operations research (90B35) Special problems of linear programming (transportation, multi-index, data envelopment analysis, etc.) (90C08)
Cites Work
- Title not available (Why is that?)
- Scheduling with batching: A review
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Scheduling Groups of Jobs on a Single Machine
- Title not available (Why is that?)
- Bicriterion Single Machine Scheduling with Resource Dependent Processing Times
- Single machine scheduling problem with a common deadline and resource dependent release dates
- Single machine scheduling subject to deadlines and resource dependent processing times
- Scheduling with batching: Minimizing the weighted number of tardy jobs
- Single machine scheduling with discretely controllable processing times
- Time-optimal control in a single machine problem with resource constraints
- Resource optimal control in some single-machine scheduling problems
- Single machine batch scheduling with deadlines and resource dependent processing times
- Scheduling to minimize the total compression and late costs
- Scheduling to minimize release-time resource consumption and tardiness penalties
Cited In (30)
- Arc-flow approach for single batch-processing machine scheduling
- The single machine serial batch scheduling problem with rejection to minimize total completion time and total rejection cost
- Title not available (Why is that?)
- Single machine batch scheduling with deadlines and resource dependent processing times
- Single-machine batch scheduling problem with job rejection and resource dependent processing times
- Single machine scheduling with resource dependent release times and processing times
- Single machine scheduling with batch set-up times to minimize maximum lateness
- Single machine batch scheduling with jointly compressible setup and processing times.
- Single machine batch scheduling to minimize total completion time and resource consumption costs
- A survey of scheduling with controllable processing times
- Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources
- Single-machine past-sequence-dependent setup times scheduling with resource allocation and learning effect
- Single batch machine scheduling with dual setup times for autoclave molding manufacturing
- A survey of scheduling problems with setup times or costs
- Scheduling two agents with controllable processing times
- Single machine group scheduling with resource dependent setup and processing times
- Serial batch scheduling on uniform parallel machines to minimize total completion time
- Scheduling a batching machine with convex resource consumption functions
- Single machine scheduling problem with batch setups involving positional deterioration effects and multiple rate-modifying activities
- Single machine group scheduling with time and position dependent processing times
- Pre-emptive scheduling problems with controllable processing times
- Single machine scheduling problem with controllable processing times and resource dependent release times
- Group scheduling with controllable setup and processing times: minimizing total weighted completion time
- Single machine batch scheduling problem to minimize makespan with controllable setup and jobs processing times
- Minimizing the total weighted flow time in a single machine with controllable processing times
- Single machine scheduling with batch-dependent setup times
- Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date
- Resource cost aware scheduling
- Single-machine batch scheduling with job processing time compatibility
This page was built for publication: Single machine batch scheduling with resource dependent setup and processing times