Single machine batch scheduling with resource dependent setup and processing times
From MaRDI portal
Publication:5954835
Recommendations
- Single machine scheduling with batch-dependent setup times
- Single machine batch scheduling with deadlines and resource dependent processing times
- Single machine scheduling problems with resource dependent processing times
- Single-machine scheduling with time-and-resource-dependent processing times
- Single machine group scheduling with resource dependent setup and processing times
- Single machine scheduling subject to deadlines and resource dependent processing times
- Single machine scheduling with resource dependent release times and processing times
- Single machine group scheduling with resource dependent setup times
- scientific article; zbMATH DE number 1859296
- Single machine serial-batching scheduling with independent setup time and deteriorating job processing times
Cites work
- scientific article; zbMATH DE number 3177183 (Why is no real title available?)
- scientific article; zbMATH DE number 1128827 (Why is no real title available?)
- Bicriterion Single Machine Scheduling with Resource Dependent Processing Times
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Resource optimal control in some single-machine scheduling problems
- Scheduling Groups of Jobs on a Single Machine
- Scheduling to minimize release-time resource consumption and tardiness penalties
- Scheduling to minimize the total compression and late costs
- Scheduling with batching: A review
- Scheduling with batching: Minimizing the weighted number of tardy jobs
- Single machine batch scheduling with deadlines and resource dependent processing times
- Single machine scheduling problem with a common deadline and resource dependent release dates
- Single machine scheduling subject to deadlines and resource dependent processing times
- Single machine scheduling with discretely controllable processing times
- Time-optimal control in a single machine problem with resource constraints
Cited in
(30)- Arc-flow approach for single batch-processing machine scheduling
- The single machine serial batch scheduling problem with rejection to minimize total completion time and total rejection cost
- Single machine batch scheduling with deadlines and resource dependent processing times
- scientific article; zbMATH DE number 1859296 (Why is no real title available?)
- Single machine scheduling with resource dependent release times and processing times
- Single-machine batch scheduling problem with job rejection and resource dependent processing times
- Single machine scheduling with batch set-up times to minimize maximum lateness
- Single machine batch scheduling with jointly compressible setup and processing times.
- Single machine batch scheduling to minimize total completion time and resource consumption costs
- A survey of scheduling with controllable processing times
- Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources
- Single-machine past-sequence-dependent setup times scheduling with resource allocation and learning effect
- Single batch machine scheduling with dual setup times for autoclave molding manufacturing
- A survey of scheduling problems with setup times or costs
- Single machine group scheduling with resource dependent setup and processing times
- Serial batch scheduling on uniform parallel machines to minimize total completion time
- Scheduling two agents with controllable processing times
- Scheduling a batching machine with convex resource consumption functions
- Pre-emptive scheduling problems with controllable processing times
- Single machine scheduling problem with controllable processing times and resource dependent release times
- Single machine group scheduling with time and position dependent processing times
- Single machine scheduling problem with batch setups involving positional deterioration effects and multiple rate-modifying activities
- Group scheduling with controllable setup and processing times: minimizing total weighted completion time
- Single machine batch scheduling problem to minimize makespan with controllable setup and jobs processing times
- Minimizing the total weighted flow time in a single machine with controllable processing times
- Single machine scheduling with batch-dependent setup times
- Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date
- Resource cost aware scheduling
- Single-machine batch scheduling with job processing time compatibility
This page was built for publication: Single machine batch scheduling with resource dependent setup and processing times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5954835)