Preemptive hybrid flowshop scheduling problem of interval orders
From MaRDI portal
Publication:5956203
DOI10.1016/S0377-2217(01)00094-7zbMath1002.90026WikidataQ126865199 ScholiaQ126865199MaRDI QIDQ5956203
Housni Djellab, Khaled Djellab
Publication date: 20 January 2003
Published in: European Journal of Operational Research (Search for Journal in Brave)
90C05: Linear programming
90B35: Deterministic scheduling theory in operations research
90C59: Approximation methods and heuristics in mathematical programming
Related Items
The method of grey related analysis to multiple attribute decision making problems with interval numbers, A taxonomy of flexible flow line scheduling procedures, Processor-shared service systems with queue-dependent processors, Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem
Uses Software
Cites Work
- Unnamed Item
- Branch and bound algorithm for the flow shop with multiple processors
- Global lower bounds for flow shops with multiple processors
- A multi-stage parallel-processor flowshop problem with minimum flowtime
- Testing for the consecutive ones property, interval graphs, and graph planarity using PQ-tree algorithms
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
- Scheduling preemptive jobs with precedence constraints on parallel machines
- Scheduling with Deadlines and Loss Functions
- Lower Bounds for the Head-Body-Tail Problem on Parallel Machines: A Computational Study of the Multiprocessor Flow Shop
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- A computational study of heuristics for two-stage flexible flowshops
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage