An improved algorithm on unbounded parallel-batching scheduling to minimize maximum cost and makespan
From MaRDI portal
Publication:6041237
DOI10.1051/RO/2023003zbMATH Open1519.90072MaRDI QIDQ6041237FDOQ6041237
Author name not available (Why is that?)
Publication date: 26 May 2023
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Recommendations
- Batching machine scheduling with bicriteria: maximum cost and makespan
- A note on unbounded parallel-batch scheduling
- Bicriteria scheduling on a series-batching machine to minimize maximum cost and makespan
- Bicriteria scheduling on a batching machine to minimize maximum lateness and makespan
- Algorithms for two kinds of parallel batch scheduling with batching costs
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Cited In (1)
This page was built for publication: An improved algorithm on unbounded parallel-batching scheduling to minimize maximum cost and makespan
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6041237)