Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
New item
In other projects
MaRDI portal item
Discussion
View source
View history
English
Log in

An improved algorithm on unbounded parallel-batching scheduling to minimize maximum cost and makespan

From MaRDI portal
Publication:6041237
Jump to:navigation, search

DOI10.1051/RO/2023003zbMATH Open1519.90072MaRDI QIDQ6041237FDOQ6041237

Author name not available (Why is that?)

Publication date: 26 May 2023

Published in: RAIRO - Operations Research (Search for Journal in Brave)





Recommendations

  • Batching machine scheduling with bicriteria: maximum cost and makespan
  • A note on unbounded parallel-batch scheduling
  • Bicriteria scheduling on a series-batching machine to minimize maximum cost and makespan
  • Bicriteria scheduling on a batching machine to minimize maximum lateness and makespan
  • Algorithms for two kinds of parallel batch scheduling with batching costs


zbMATH Keywords

makespanPareto optimal solutionsbicriteria schedulingmaximum costparallel-batching


Mathematics Subject Classification ID

Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)



Cited In (1)

  • Bicriteria scheduling on a batching machine to minimize maximum lateness and makespan





This page was built for publication: An improved algorithm on unbounded parallel-batching scheduling to minimize maximum cost and makespan

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6041237)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:6041237&oldid=35462085"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 10 July 2024, at 05:38. Warning: Page may not contain recent updates.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki