Real-time validation of an automatic generation control system considering HPA-ISE with crow search algorithm optimized cascade FOPDN-FOPIDN controller
From MaRDI portal
Publication:6054152
DOI10.24425/ACS.2023.146280zbMath1521.93117OpenAlexW4380629441MaRDI QIDQ6054152
Tirumalasetty Chiranjeevi, Ramesh Devarapalli, Naladi Ram Babu, Fausto Pedro García Márquez, Łukasz Knypiński
Publication date: 27 September 2023
Published in: Archives of Control Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.24425/acs.2023.146280
Approximation methods and heuristics in mathematical programming (90C59) Automated systems (robots, etc.) in control theory (93C85)
Cites Work
- Load frequency control of a two-area multi-source power system using a tilt integral derivative controller
- Development of rapid and reliable cuckoo search algorithm for global maximum power point tracking of solar PV systems in partial shading condition
- Power system oscillation damping controller design: a novel approach of integrated HHO-PSO algorithm
- Spider monkey optimization (SMO) – lattice Levenberg–Marquardt recursive least squares based grid synchronization control scheme for a three-phase PV system
This page was built for publication: Real-time validation of an automatic generation control system considering HPA-ISE with crow search algorithm optimized cascade FOPDN-FOPIDN controller