A min–max solution to optimise planned lead time in a remanufacturing system
From MaRDI portal
Cites work
- A distribution-free newsvendor problem with nonlinear holding cost
- A minimax distribution-free procedure for a newsvendor problem with free shipping
- An evaluation of capacity planning techniques in a remanufacturing environment
- An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies
- Control of a production-inventory system with returns under imperfect advance return information
- Expected Value of Distribution Information for the Newsvendor Problem
- Heuristics for demand-driven disassembly planning
- Joint control of production, remanufacturing, and disposal activities in a hybrid manufacturing-remanufacturing system
- Managing new and remanufactured products to mitigate environmental damage under emissions regulation
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Newsvendor optimization with limited distribution information
- Optimal production planning for a multi-product closed loop system with uncertain demand and return
- Regret in the Newsvendor Model with Partial Information
- Remanufacturing and pricing decisions with random yield and random demand
- Robust newsvendor competition under asymmetric information
- The Distribution Free Newsboy Problem: Review and Extensions
- The distribution-free newsboy problem under the worst-case and best-case scenarios
- The impact of information sharing, random yield, correlation, and lead times in closed loop supply chains
- Two-stage make-to-order remanufacturing with service-level constraints
This page was built for publication: A min–max solution to optimise planned lead time in a remanufacturing system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6070976)