Time-flexible min completion time variance in a single machine by quadratic programming
From MaRDI portal
Publication:6090146
DOI10.1016/J.EJOR.2023.06.034OpenAlexW4381486844MaRDI QIDQ6090146FDOQ6090146
Authors: Stefano Nasini, Rabia Nessah
Publication date: 14 November 2023
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2023.06.034
Cites Work
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- A storm of feasibility pumps for nonconvex MINLP
- Approximation algorithms for scheduling unrelated parallel machines
- A convex envelope formula for multilinear functions
- About Lagrangian methods in integer optimization
- Tabu search for a class of single-machine scheduling problems
- Pseudopolynomial algorithms for CTV minimization in single machine scheduling
- Approximability of flow shop scheduling
- Completion time variance minimization on a single machine is difficult
- Variance Minimization in Single Machine Sequencing Problems
- Proof of a conjecture of Schrage about the completion time variance problem
- A branch and bound algorithm to minimize completion time variance on a single processor.
- Batch scheduling and common due-date assignment on a single machine
- Minimizing the Time-in-System Variance for a Finite Jobset
- Minimising Waiting Time Variance in the Single Machine Problem
- Minimizing Variation of Flow Time in Single Machine Systems
- A cutting-plane approach for large-scale capacitated multi-period facility location using a specialized interior-point method
- Fast fully polynomial approximation schemes for minimizing completion time variance
- Bounds for the position of the smallest job in completion time variance minimization
- Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs
- A lower bound for weighted completion time variance
- An almost exact solution to the min completion time variance in a single machine
- A specialized interior-point algorithm for huge minimum convex cost flows in bipartite networks
This page was built for publication: Time-flexible min completion time variance in a single machine by quadratic programming
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6090146)