Warranty service outsourcing contracts decision considering warranty fraud and inspection
From MaRDI portal
(Redirected from Publication:6091871)
Cites work
- Allocation Models and Heuristics for the Outsourcing of Repairs for a Dynamic Warranty Population
- Call center outsourcing: coordinating staffing level and service quality
- Closed-loop supply chain models with product remanufacturing
- Cooperative advertising in a capacitated manufacturer-retailer supply chain: a game-theoretic approach
- Dual-channel supply chain equilibrium problems regarding retail services and fairness concerns
- Dynamic routing of prioritized warranty repairs
- Information sharing under different warranty policies with cost sharing in supply chains
- Make-or-buy service capacity decision in a supply chain providing after-sales service
- Manufacturer's return policy in a two-stage supply chain with two risk-averse retailers and random demand
- Optimizing product service system by franchise fee contracts under information asymmetry
- Outsourcing warranty repairs: Dynamic allocation
- Service outsourcing and disaster response methods in a relief supply chain
- Service outsourcing under different supply chain power structures
- Supply chain risk analysis with mean-variance models: a technical review
Cited in
(4)- Determination of the optimal warranty policy and period from the manufacturer’s/seller’s perspective
- Negotiation for service contracting: incentives, bargaining power, and customer risk aversion
- Influences of risk-aversion behavior and purchasing option in a cross-border dual-channel supply chain
- Optimal pricing and warranty strategies of a closed-loop supply chain under government subsidies
This page was built for publication: Warranty service outsourcing contracts decision considering warranty fraud and inspection
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6091871)